IAC logo
IAC Assessment: UF0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2011
Principal Product pens
NAICS 339940 - Office Supplies (except Paper) Manufacturing
SIC 3951 - Pens And Mechanical Pencils
Sales $50,000,000-$100,000,000
# of Employees 228
Plant Area (Sq.Ft.) 146,574
Annual Production 80,000,000 Units
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $545,056 8,637,220 kWh $0.06
Electricity Demand $70,512 15,520 kW-months/year $4.54
Natural Gas $3,823 311 MMBtu $12.30
TOTAL ENERGY COSTS $619,391
RECOMMENDED SAVINGS* $66,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,243
Cost:
-
$1,243 17,500 - - $1,243
17,500
kWh
-
-
kW-months/year
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$8,379
Cost:
$5,375
$7,359 116,813 $1,020 19 $7,359
116,813
kWh
$1,020
19
kW-months/year
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,216
Cost:
$225
- - $3,216 59 -
-
kWh
$3,216
59
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,987
Cost:
$4,040
$6,987 98,408 - - $6,987
98,408
kWh
-
-
kW-months/year
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$10,497
Cost:
$4,335
$10,497 147,846 - - $10,497
147,846
kWh
-
-
kW-months/year
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$426
Cost:
$396
$426 6,004 - - $426
6,004
kWh
-
-
kW-months/year
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$713
Cost:
$90
$713 11,323 - - $713
11,323
kWh
-
-
kW-months/year
08: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$23,120
Cost:
$7,950
$23,120 325,636 - - $23,120
325,636
kWh
-
-
kW-months/year
09: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS Savings:
$11,651
Cost:
$9,970
$11,651 184,930 - - $11,651
184,930
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$66,232
Cost:
$32,381
$61,996 908,460 $4,236 78 $61,996
908,460
kWh
$4,236
78
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand