IAC Assessment: UF0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2011
Principal Product cat litter
NAICS 327992 - Ground or Treated Mineral and Earth Manufacturing
SIC 3295 - Minerals, Ground Or Treated
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 1,225,391
Annual Production 100,000 Tons
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $457,435 5,912,100 kWh $0.08
Electricity Demand $80,596 12,537 kW-months/year $6.43
Natural Gas $309,002 194,482 MMBtu $1.59
TOTAL ENERGY COSTS $847,033
RECOMMENDED SAVINGS* $98,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,701
Cost:
$6,982
- - - - $12,701 7,988 -
-
kWh
-
-
kW-months/year
$12,701
7,988
MMBtu
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$455
Cost:
$985
- - - - $455 287 -
-
kWh
-
-
kW-months/year
$455
287
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,292
Cost:
$12,615
$19,705 252,626 $3,587 558 - - $19,705
252,626
kWh
$3,587
558
kW-months/year
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$439
Cost:
$147
$439 5,634 - - - - $439
5,634
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$125
Cost:
$120
$125 1,594 - - - - $125
1,594
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,042
Cost:
-
$18,042 196,675 - - - - $18,042
196,675
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,286
Cost:
$680
$19,753 256,532 $4,533 705 - - $19,753
256,532
kWh
$4,533
705
kW-months/year
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,428
Cost:
$19,015
$15,801 205,209 $3,627 564 - - $15,801
205,209
kWh
$3,627
564
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$98,768
Cost:
$40,544
$73,865 918,270 $11,747 1,827 $13,156 8,275 $73,865
918,270
kWh
$11,747
1,827
kW-months/year
$13,156
8,275
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas