IAC logo
IAC Assessment: UF0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2011
Principal Product medical devices
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 40,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 2,184
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,309 851,110 kWh $0.10
Electricity Demand $28,906 2,664 kW-months/year $10.85
TOTAL ENERGY COSTS $110,215
RECOMMENDED SAVINGS* $18,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,813
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$493
Cost:
-
$276 2,877 $217 20 $276
2,877
kWh
$217
20
kW-months/year
02: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$138
Cost:
$280
$138 1,439 - - $138
1,439
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$853
Cost:
$482
$853 6,611 - - $853
6,611
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,832
Cost:
$5,165
$3,598 37,477 $2,234 206 $3,598
37,477
kWh
$2,234
206
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,884
Cost:
$1,676
$1,884 14,603 - - $1,884
14,603
kWh
-
-
kW-months/year
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$697
Cost:
-
$697 7,258 - - $697
7,258
kWh
-
-
kW-months/year
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$3,726
Cost:
$1,919
$3,726 28,882 - - $3,726
28,882
kWh
-
-
kW-months/year
08: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$2,799
Cost:
$7,128
$2,799 21,695 - - $2,799
21,695
kWh
-
-
kW-months/year
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$659
Cost:
$686
$659 6,800 - - $659
6,800
kWh
-
-
kW-months/year
10: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$227
Cost:
$21
$227 1,757 - - $227
1,757
kWh
-
-
kW-months/year
11: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,450
Cost:
$576
$1,450 11,244 - - $1,450
11,244
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$18,758
Cost:
$17,933
$16,307 140,643 $2,451 226 $16,307
140,643
kWh
$2,451
226
kW-months/year
TOTAL IMPLEMENTED Savings:
$4,813
Cost:
$2,865
$4,596 39,906 $217 20 $4,596
39,906
kWh
$217
20
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand