IAC logo
IAC Assessment: UF0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Dynamic Weighing Equipment
NAICS 333997 - Scale and Balance Manufacturing
SIC 3596 - Scales And Balances, Exc. Laboratory
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 63,210
Annual Production 100 Units
Production Hrs. Annual 4,862
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,139 1,497,016 kWh $0.09
Electricity Demand $33,324 4,560 kW-months/year $7.31
Electricity Fees $1,969 - $ -
TOTAL ENERGY COSTS $166,432
RECOMMENDED SAVINGS* $78,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,533
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,263
Cost:
$5,454
$3,716 42,415 $1,547 212 - - $3,716
42,415
kWh
$1,547
212
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,519
Cost:
$1,169
$4,519 51,586 - - - - $4,519
51,586
kWh
-
-
kW-months/year
-
-
$
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$4,067
Cost:
$3,216
$4,067 46,430 - - - - $4,067
46,430
kWh
-
-
kW-months/year
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,070
Cost:
$1,171
$2,070 23,633 - - - - $2,070
23,633
kWh
-
-
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,010
Cost:
$6,500
$1,450 16,552 $560 77 - - $1,450
16,552
kWh
$560
77
kW-months/year
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,014
Cost:
$667
$1,014 11,575 - - - - $1,014
11,575
kWh
-
-
kW-months/year
-
-
$
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$60,000
Cost:
$55,338
- - - - $60,000 - -
-
kWh
-
-
kW-months/year
$60,000
-
$
TOTAL RECOMMENDED Savings:
$78,943
Cost:
$73,515
$16,836 192,191 $2,107 288 $60,000 - $16,836
192,191
kWh
$2,107
288
kW-months/year
$60,000
-
$
TOTAL IMPLEMENTED Savings:
$5,533
Cost:
$1,836
$5,533 63,161 - - - - $5,533
63,161
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product