Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2017 |
Principal Product | Animal Feeds |
NAICS | 311119 - Other Animal Food Manufacturing |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 22 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 50,244 Tons |
Production Hrs. Annual | 6,336 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $131,682 | 1,534,080 | kWh | $0.09 |
Natural Gas | $56,594 | 6,773 | MMBtu | $8.36 |
TOTAL ENERGY COSTS | $200,338 | |||
RECOMMENDED SAVINGS* | $30,983 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,304 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Water Usage | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,676 Cost: $1,124 |
$6,676 | 77,806 | - | - | - | - | - | - | - | - |
$6,676 77,806 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,643 Cost: $3,762 |
- | - | $2,643 | 316 | - | - | - | - | - | - |
- - kWh |
$2,643 316 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,363 Cost: $210 |
$2,363 | 27,542 | - | - | - | - | - | - | - | - |
$2,363 27,542 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $814 Cost: $876 |
- | - | $624 | 75 | $190 | 38 | - | - | - | - |
- - kWh |
$624 75 MMBtu |
$190 38 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY |
Savings: $14,679 Cost: $43,710 |
- | - | - | - | - | - | $14,679 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$14,679 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $3,808 Cost: - |
- | - | - | - | - | - | - | - | $3,808 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - $ |
$3,808 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,983 Cost: $49,682 |
$9,039 | 105,348 | $3,267 | 391 | $190 | 38 | $14,679 | - | $3,808 | - | $9,039 105,348 kWh |
$3,267 391 MMBtu |
$190 38 Tgal |
$14,679 - $ |
$3,808 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,304 Cost: $5,972 |
$9,039 | 105,348 | $3,267 | 391 | $190 | 38 | - | - | $3,808 | - | $9,039 105,348 kWh |
$3,267 391 MMBtu |
$190 38 Tgal |
- - $ |
$3,808 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Water Usage | Administrative Changes | Primary Product |