IAC logo
IAC Assessment: UF0509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Disposable Plastic Leads
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 300,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $395,753 6,116,734 kWh $0.06
Electricity Demand $198,836 16,721 kW-months/year $11.89
TOTAL ENERGY COSTS $594,589
RECOMMENDED SAVINGS* $57,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,087
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$5,078
Cost:
$10,260
$4,857 75,062 $222 19 - - $4,857
75,062
kWh
$222
19
kW-months/year
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,408
Cost:
$940
$4,225 65,307 $183 15 - - $4,225
65,307
kWh
$183
15
kW-months/year
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,560
Cost:
-
$1,471 22,729 $89 8 - - $1,471
22,729
kWh
$89
8
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,157
Cost:
$844
$2,157 33,337 - - - - $2,157
33,337
kWh
-
-
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,130
Cost:
$3,321
$1,076 16,635 $53 5 - - $1,076
16,635
kWh
$53
5
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,241
Cost:
$1,280
$1,241 19,177 - - - - $1,241
19,177
kWh
-
-
kW-months/year
-
-
$
07: 3.5215 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK Savings:
$42,000
Cost:
-
- - - - $42,000 - -
-
kWh
-
-
kW-months/year
$42,000
-
$
TOTAL RECOMMENDED Savings:
$57,573
Cost:
$16,645
$15,027 232,247 $546 46 $42,000 - $15,027
232,247
kWh
$546
46
kW-months/year
$42,000
-
$
TOTAL IMPLEMENTED Savings:
$48,087
Cost:
$5,445
$5,945 91,878 $142 12 $42,000 - $5,945
91,878
kWh
$142
12
kW-months/year
$42,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product