IAC Assessment: UF0510
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0510
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2017
Principal Product Electronics Manufacturing
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 150,000
Annual Production 100 Units
Production Hrs. Annual 3,840
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,899 2,593,595 kWh $0.06
Electricity Demand $74,950 7,203 kW-months/year $10.40
Electricity Fees $22,020 - $ -
TOTAL ENERGY COSTS $240,869
RECOMMENDED SAVINGS* $1,034,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,031,422
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,528
Cost:
$419
$960 17,461 $568 55 - - $960
17,461
kWh
$568
55
kW-months/year
-
-
$
02: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,757
Cost:
-
$1,175 21,362 $582 56 - - $1,175
21,362
kWh
$582
56
kW-months/year
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,142
Cost:
$225
$718 13,056 $424 41 - - $718
13,056
kWh
$424
41
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$908
Cost:
$689
$908 16,512 - - - - $908
16,512
kWh
-
-
kW-months/year
-
-
$
05: 4.446 AUTOMATE FINISHING PROCESS Savings:
$84,346
Cost:
$5,030
$(-84) (-1,536) $(-50) (-5) $84,480 - $(-84)
(-1,536)
kWh
$(-50)
(-5)
kW-months/year
$84,480
-
$
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$944,640
Cost:
$126,336
- - - - $944,640 - -
-
kWh
-
-
kW-months/year
$944,640
-
$
TOTAL RECOMMENDED Savings:
$1,034,321
Cost:
$132,699
$3,677 66,855 $1,524 147 $1,029,120 - $3,677
66,855
kWh
$1,524
147
kW-months/year
$1,029,120
-
$
TOTAL IMPLEMENTED Savings:
$1,031,422
Cost:
$132,474
$1,784 32,437 $518 50 $1,029,120 - $1,784
32,437
kWh
$518
50
kW-months/year
$1,029,120
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product