IAC logo
IAC Assessment: UF0519
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0519
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2018
Principal Product Commercial Printing, Lithographic
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 277
Plant Area (Sq.Ft.) 250,000
Annual Production 183,205,000 Units
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,061,709 18,660,660 kWh $0.06
Electricity Demand $422,211 34,523 kW-months/year $12.23
Electricity Fees $127,458 - $ -
Natural Gas $169,522 44,884 MMBtu $3.78
TOTAL ENERGY COSTS $1,780,900
RECOMMENDED SAVINGS* $87,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,619
#|Description Savings
Cost
Status Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost
$ kWh $ $
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$27,363
Cost:
$868
$27,363 480,060 - - $27,363
480,060
kWh
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,618
Cost:
$30,000
- - $17,618 - -
-
kWh
$17,618
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$11,657
Cost:
$25,600
$11,657 204,506 - - $11,657
204,506
kWh
-
-
$
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,569
Cost:
$45,225
$8,569 150,342 - - $8,569
150,342
kWh
-
-
$
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$6,694
Cost:
$2,710
$6,694 117,440 - - $6,694
117,440
kWh
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,422
Cost:
$25,600
$5,422 95,115 - - $5,422
95,115
kWh
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,271
Cost:
$25,600
$4,271 74,922 - - $4,271
74,922
kWh
-
-
$
08: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,514
Cost:
$3,216
$2,514 44,100 - - $2,514
44,100
kWh
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,687
Cost:
$1,850
$1,687 29,596 - - $1,687
29,596
kWh
-
-
$
10: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$1,226
Cost:
$5,454
$1,226 21,520 - - $1,226
21,520
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$87,021
Cost:
$166,123
$69,403 1,217,601 $17,618 - $69,403
1,217,601
kWh
$17,618
-
$
TOTAL IMPLEMENTED Savings:
$37,619
Cost:
$47,943
$37,619 659,998 - - $37,619
659,998
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost