Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2018
Principal Product Terpene Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 18
Plant Area (Sq.Ft.) 150,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,561 2,537,613 kWh $0.06
Electricity Demand $78,434 5,148 kW-months/year $15.24
Electricity Fees $36,846 - $ -
Natural Gas $77,533 13,923 MMBtu $5.57
Other Energy $212,806 23,422 MMBtu $9.09
TOTAL ENERGY COSTS $554,180
RECOMMENDED SAVINGS* $307,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$219,545
Cost:
$970,000
$152,100 2,600,000 $73,133 4,800 $(-119,912) (-21,532) $114,224 12,572 - - - - $152,100
2,600,000
kWh
$73,133
4,800
kW-months/year
$(-119,912)
(-21,532)
MMBtu
$114,224
12,572
MMBtu
-
-
$
-
-
$
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$4,699
Cost:
$15,000
- - - - $4,699 844 - - - - - - -
-
kWh
-
-
kW-months/year
$4,699
844
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$5,366
Cost:
$5,125
$5,366 91,728 - - - - - - - - - - $5,366
91,728
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,303
Cost:
$2,207
- - - - - - - - $1,303 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,303
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,084
Cost:
$1,020
$722 12,355 $362 24 - - - - - - - - $722
12,355
kWh
$362
24
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 3.6114 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE Savings:
$75,538
Cost:
$33,400
- - - - - - - - - - $75,538 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$75,538
-
$
TOTAL RECOMMENDED Savings:
$307,535
Cost:
$1,026,752
$158,188 2,704,083 $73,495 4,824 $(-115,213) (-20,688) $114,224 12,572 $1,303 - $75,538 - $158,188
2,704,083
kWh
$73,495
4,824
kW-months/year
$(-115,213)
(-20,688)
MMBtu
$114,224
12,572
MMBtu
$1,303
-
$
$75,538
-
$
TOTAL IMPLEMENTED Savings:
$82,624
Cost:
$51,627
$722 12,355 $362 24 $4,699 844 - - $1,303 - $75,538 - $722
12,355
kWh
$362
24
kW-months/year
$4,699
844
MMBtu
-
-
MMBtu
$1,303
-
$
$75,538
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes By-product Production