IAC logo
IAC Assessment: UF0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Roofing Insulation and Composite Materials
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 132
Plant Area (Sq.Ft.) 400,000
Annual Production 8,300,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $529,340 9,298,571 kWh $0.06
Electricity Demand $112,366 16,722 kW-months/year $6.72
Electricity Fees $78,520 - $ -
Natural Gas $817,470 373,302 MMBtu $2.19
TOTAL ENERGY COSTS $1,565,482
RECOMMENDED SAVINGS* $108,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,449
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.8212 REDUCE DELIVERY SCHEDULES Savings:
$43,506
Cost:
-
- - - - - - $40,000 - $3,506 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$40,000
-
$
$3,506
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,621
Cost:
$2,800
- - - - $19,621 8,959 - - - - - - -
-
kWh
-
-
kW-months/year
$19,621
8,959
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,666
Cost:
$30,000
- - - - $14,666 6,697 - - - - - - -
-
kWh
-
-
kW-months/year
$14,666
6,697
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$14,533
Cost:
$1,600
- - - - $14,533 6,636 - - - - - - -
-
kWh
-
-
kW-months/year
$14,533
6,636
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,991
Cost:
$4,959
$6,879 120,888 $1,112 166 - - - - - - - - $6,879
120,888
kWh
$1,112
166
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,925
Cost:
$1,308
- - - - $2,925 1,336 - - - - - - -
-
kWh
-
-
kW-months/year
$2,925
1,336
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$2,600
Cost:
$9,464
$2,600 45,693 - - - - - - - - - - $2,600
45,693
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,990
Cost:
-
$1,990 34,969 - - - - - - - - - - $1,990
34,969
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$735
Cost:
-
$537 9,442 - - - - $90 - - - $108 - $537
9,442
kWh
-
-
kW-months/year
-
-
MMBtu
$90
-
$
-
-
$
$108
-
$
TOTAL RECOMMENDED Savings:
$108,567
Cost:
$50,131
$12,006 210,992 $1,112 166 $51,745 23,628 $40,090 - $3,506 - $108 - $12,006
210,992
kWh
$1,112
166
kW-months/year
$51,745
23,628
MMBtu
$40,090
-
$
$3,506
-
$
$108
-
$
TOTAL IMPLEMENTED Savings:
$25,449
Cost:
$7,867
$6,879 120,888 $1,112 166 $17,458 7,972 - - - - - - $6,879
120,888
kWh
$1,112
166
kW-months/year
$17,458
7,972
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost