IAC logo
IAC Assessment: UF0526
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0526
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Bread Products
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 250,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 4,862
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $793,917 12,362,955 kWh $0.06
Electricity Demand $196,416 23,673 kW-months/year $8.30
Electricity Fees $3,628 - $ -
Natural Gas $853,109 242,225 MMBtu $3.52
TOTAL ENERGY COSTS $1,932,873
RECOMMENDED SAVINGS* $914,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $914,306
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$727,193
Cost:
$3,000,000
$1,035,200 16,000,000 $199,200 24,000 $(-329,607) (-93,585) - - $(-177,600) - - - $1,035,200
16,000,000
kWh
$199,200
24,000
kW-months/year
$(-329,607)
(-93,585)
MMBtu
-
-
$
$(-177,600)
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$95,677
Cost:
$50,000
- - - - $95,677 27,166 - - - - - - -
-
kWh
-
-
kW-months/year
$95,677
27,166
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$75,075
Cost:
$4,000
- - - - $75,075 21,316 - - - - - - -
-
kWh
-
-
kW-months/year
$75,075
21,316
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,403
Cost:
-
$3,210 49,611 - - - - $936 - - - $1,257 - $3,210
49,611
kWh
-
-
kW-months/year
-
-
MMBtu
$936
-
$
-
-
$
$1,257
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,088
Cost:
$496
$5,088 78,642 - - - - - - - - - - $5,088
78,642
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$3,132
Cost:
$9,341
$3,132 48,407 - - - - - - - - - - $3,132
48,407
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,738
Cost:
$13,541
$2,329 36,004 $409 49 - - - - - - - - $2,329
36,004
kWh
$409
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$914,306
Cost:
$3,077,378
$1,048,959 16,212,664 $199,609 24,049 $(-158,855) (-45,104) $936 - $(-177,600) - $1,257 - $1,048,959
16,212,664
kWh
$199,609
24,049
kW-months/year
$(-158,855)
(-45,104)
MMBtu
$936
-
$
$(-177,600)
-
$
$1,257
-
$
TOTAL IMPLEMENTED Savings:
$914,306
Cost:
$3,077,378
$1,048,959 16,212,664 $199,609 24,049 $(-158,855) (-45,104) $936 - $(-177,600) - $1,257 - $1,048,959
16,212,664
kWh
$199,609
24,049
kW-months/year
$(-158,855)
(-45,104)
MMBtu
$936
-
$
$(-177,600)
-
$
$1,257
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost