Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2019 |
Principal Product | Corn and Potatoes Snacks |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 50,000 Tons |
Production Hrs. Annual | 8,712 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,213,979 | 19,267,006 | kWh | $0.06 |
Electricity Demand | $265,213 | 31,566 | kW-months/year | $8.40 |
Electricity Fees | $149,418 | - | $ | - |
Natural Gas | $141,076 | 320,097 | MMBtu | $0.44 |
TOTAL ENERGY COSTS | $2,575,465 | |||
RECOMMENDED SAVINGS* | $258,333 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $234,011 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $109,260 Cost: $320,000 |
$97,161 | 1,542,240 | $12,099 | 1,440 | - | - | - | - |
$97,161 1,542,240 kWh |
$12,099 1,440 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $67,747 Cost: $55,000 |
$60,691 | 963,350 | - | - | $7,056 | 16,000 | - | - |
$60,691 963,350 kWh |
- - kW-months/year |
$7,056 16,000 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $29,180 Cost: $25,340 |
$29,180 | 463,178 | - | - | - | - | - | - |
$29,180 463,178 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $12,645 Cost: $10,000 |
- | - | - | - | $12,645 | 28,673 | - | - |
- - kWh |
- - kW-months/year |
$12,645 28,673 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $11,158 Cost: $9,464 |
$11,158 | 177,113 | - | - | - | - | - | - |
$11,158 177,113 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,139 Cost: $10,000 |
- | - | - | - | $2,139 | 4,850 | - | - |
- - kWh |
- - kW-months/year |
$2,139 4,850 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,882 Cost: $2,800 |
- | - | - | - | $1,882 | 4,268 | - | - |
- - kWh |
- - kW-months/year |
$1,882 4,268 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $24,322 Cost: $15,000 |
$(-607) | (-9,634) | - | - | $(-71) | (-160) | $25,000 | - |
$(-607) (-9,634) kWh |
- - kW-months/year |
$(-71) (-160) MMBtu |
$25,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $258,333 Cost: $447,604 |
$197,583 | 3,136,247 | $12,099 | 1,440 | $23,651 | 53,631 | $25,000 | - | $197,583 3,136,247 kWh |
$12,099 1,440 kW-months/year |
$23,651 53,631 MMBtu |
$25,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $234,011 Cost: $432,604 |
$198,190 | 3,145,881 | $12,099 | 1,440 | $23,722 | 53,791 | - | - | $198,190 3,145,881 kWh |
$12,099 1,440 kW-months/year |
$23,722 53,791 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material |