IAC Assessment: UF0538
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0538
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Panel Doors
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 318,257
Annual Production 75,000 Units
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,920 1,423,533 kWh $0.05
Electricity Demand $73,701 6,252 kW-months/year $11.79
Electricity Fees $27,365 - $ -
LPG $4,304 105 MMBtu $41.07
TOTAL ENERGY COSTS $176,290
RECOMMENDED SAVINGS* $50,724 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,744
Cost:
$52,547
$10,907 218,130 $14,837 1,258 - - $10,907
218,130
kWh
$14,837
1,258
kW-months/year
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$11,989
Cost:
$45,500
$11,989 239,782 - - - - $11,989
239,782
kWh
-
-
kW-months/year
-
-
$
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$11,027
Cost:
$7,692
$4,672 93,434 $6,355 539 - - $4,672
93,434
kWh
$6,355
539
kW-months/year
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,964
Cost:
$6,180
$(-183) (-3,661) $(-249) (-21) $2,396 - $(-183)
(-3,661)
kWh
$(-249)
(-21)
kW-months/year
$2,396
-
$
TOTAL RECOMMENDED Savings:
$50,724
Cost:
$111,919
$27,385 547,685 $20,943 1,776 $2,396 - $27,385
547,685
kWh
$20,943
1,776
kW-months/year
$2,396
-
$
TOTAL IMPLEMENTED Savings:
$50,724
Cost:
$111,919
$27,385 547,685 $20,943 1,776 $2,396 - $27,385
547,685
kWh
$20,943
1,776
kW-months/year
$2,396
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes