Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2019 |
Principal Product | Berries Processing |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $5,000,000-$10,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 8,000,000 Units |
Production Hrs. Annual | 4,680 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $106,831 | 879,500 | kWh | $0.12 |
Electricity Fees | $10,946 | - | $ | - |
TOTAL ENERGY COSTS | $117,777 | |||
RECOMMENDED SAVINGS* | $99,084 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,675 |
#|Description |
Savings Cost |
Status | Electricity Usage | Ancillary Material Cost | Electricity Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $38,262 Cost: $166,880 |
$38,262 | 316,217 | - | - |
$38,262 316,217 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $6,161 Cost: $518 |
$6,161 | 50,918 | - | - |
$6,161 50,918 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $4,651 Cost: $11,760 |
$4,651 | 38,434 | - | - |
$4,651 38,434 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,250 Cost: $11,853 |
$4,250 | 35,127 | - | - |
$4,250 35,127 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,002 Cost: $3,662 |
$1,002 | 8,279 | - | - |
$1,002 8,279 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY |
Savings: $44,758 Cost: $3,326 |
$(-242) | (-2,000) | $45,000 | - |
$(-242) (-2,000) kWh |
$45,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $99,084 Cost: $197,999 |
$54,084 | 446,975 | $45,000 | - | $54,084 446,975 kWh |
$45,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,675 Cost: $182,913 |
$49,675 | 410,541 | - | - | $49,675 410,541 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Ancillary Material Cost | Electricity Usage | Ancillary Material Cost |