IAC Assessment: UF0541
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2019
Principal Product Organic Silicone Intermediates
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 871,200
Annual Production 5,300 Tons
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,167,286 13,525,200 kWh $0.09
Electricity Demand $213,798 21,928 kW-months/year $9.75
Electricity Fees $255,342 - $ -
Natural Gas $279,549 42,192 MMBtu $6.63
TOTAL ENERGY COSTS $1,915,975
RECOMMENDED SAVINGS* $451,978 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $446,058
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$365,719
Cost:
$1,800,000
$753,360 8,760,000 $117,000 12,000 $(-565,841) (-85,397) $61,200 - $753,360
8,760,000
kWh
$117,000
12,000
kW-months/year
$(-565,841)
(-85,397)
MMBtu
$61,200
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$40,964
Cost:
$16,606
$33,359 387,896 $7,605 780 - - - - $33,359
387,896
kWh
$7,605
780
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$22,041
Cost:
$3,368
- - - - $22,041 3,326 - - -
-
kWh
-
-
kW-months/year
$22,041
3,326
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,463
Cost:
$2,551
- - - - $11,463 1,730 - - -
-
kWh
-
-
kW-months/year
$11,463
1,730
MMBtu
-
-
$
05: 2.1222 INSTALL TURBULATORS Savings:
$5,920
Cost:
$7,500
- - - - $5,920 894 - - -
-
kWh
-
-
kW-months/year
$5,920
894
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,871
Cost:
$1,550
- - - - $5,871 886 - - -
-
kWh
-
-
kW-months/year
$5,871
886
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$451,978
Cost:
$1,831,575
$786,719 9,147,896 $124,605 12,780 $(-520,546) (-78,561) $61,200 - $786,719
9,147,896
kWh
$124,605
12,780
kW-months/year
$(-520,546)
(-78,561)
MMBtu
$61,200
-
$
TOTAL IMPLEMENTED Savings:
$446,058
Cost:
$1,824,075
$786,719 9,147,896 $124,605 12,780 $(-526,466) (-79,455) $61,200 - $786,719
9,147,896
kWh
$124,605
12,780
kW-months/year
$(-526,466)
(-79,455)
MMBtu
$61,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material