IAC logo
IAC Assessment: UF0545
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0545
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 24
Plant Area (Sq.Ft.) 767,250
Annual Production 7,439,700 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,063,061 16,988,917 kWh $0.06
TOTAL ENERGY COSTS $1,063,061
RECOMMENDED SAVINGS* $128,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $128,672
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Primary Raw Material Electricity Usage Personnel Changes Primary Raw Material
$ kWh $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$67,090
Cost:
$20,230
$67,090 1,073,441 - - - - $67,090
1,073,441
kWh
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$51,046
Cost:
$88,272
$51,046 816,732 - - - - $51,046
816,732
kWh
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,536
Cost:
-
$9,929 158,869 $359 - $248 - $9,929
158,869
kWh
$359
-
$
$248
-
$
TOTAL RECOMMENDED Savings:
$128,672
Cost:
$108,502
$128,065 2,049,042 $359 - $248 - $128,065
2,049,042
kWh
$359
-
$
$248
-
$
TOTAL IMPLEMENTED Savings:
$128,672
Cost:
$108,502
$128,065 2,049,042 $359 - $248 - $128,065
2,049,042
kWh
$359
-
$
$248
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Primary Raw Material Electricity Usage Personnel Changes Primary Raw Material