Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Half & Half and Creams
NAICS 311511 - Fluid Milk Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 170,000
Annual Production 65,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,016,692 11,086,805 kWh $0.09
Natural Gas $502,190 156,878 MMBtu $3.20
TOTAL ENERGY COSTS $1,724,367
RECOMMENDED SAVINGS* $1,676,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,658,034
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ MMBtu $ gal $ $ $ $ $ $
01: 2.9141 Install Anaerobic Digester Savings:
$1,032,365
Cost:
$4,965,000
- - $527,518 164,798 $291,200 832,000 - - - - $213,647 - -
-
kWh
$527,518
164,798
MMBtu
$291,200
832,000
gal
-
-
$
-
-
$
$213,647
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$537,853
Cost:
$1,400,000
$782,000 8,500,000 $(-159,147) (-49,718) - - $(-85,000) - - - - - $782,000
8,500,000
kWh
$(-159,147)
(-49,718)
MMBtu
-
-
gal
$(-85,000)
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$62,520
Cost:
$30,000
- - $62,520 19,531 - - - - - - - - -
-
kWh
$62,520
19,531
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.1222 INSTALL TURBULATORS Savings:
$18,151
Cost:
$7,500
- - $18,151 5,670 - - - - - - - - -
-
kWh
$18,151
5,670
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$14,189
Cost:
$1,500
$14,189 154,223 - - - - - - - - - - $14,189
154,223
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,254
Cost:
$4,938
$6,254 67,983 - - - - - - - - - - $6,254
67,983
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,687
Cost:
$1,936
- - $2,687 839 - - - - - - - - -
-
kWh
$2,687
839
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,166
Cost:
-
$1,662 18,069 - - - - $298 - $206 - - - $1,662
18,069
kWh
-
-
MMBtu
-
-
gal
$298
-
$
$206
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,676,185
Cost:
$6,410,874
$804,105 8,740,275 $451,729 141,121 $291,200 832,000 $(-84,702) - $206 - $213,647 - $804,105
8,740,275
kWh
$451,729
141,121
MMBtu
$291,200
832,000
gal
$(-84,702)
-
$
$206
-
$
$213,647
-
$
TOTAL IMPLEMENTED Savings:
$1,658,034
Cost:
$6,403,374
$804,105 8,740,275 $433,578 135,451 $291,200 832,000 $(-84,702) - $206 - $213,647 - $804,105
8,740,275
kWh
$433,578
135,451
MMBtu
$291,200
832,000
gal
$(-84,702)
-
$
$206
-
$
$213,647
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost By-product Production