IAC logo
IAC Assessment: UF0558
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0558
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Alternative Fuels
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 103,000
Annual Production 26,149 Tons
Production Hrs. Annual 5,824
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,800 1,608,806 kWh $0.05
Electricity Demand $90,522 7,670 kW-months/year $11.80
Electricity Fees $44,306 - $ -
TOTAL ENERGY COSTS $209,628
RECOMMENDED SAVINGS* $1,622,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,622,587
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,597
Cost:
$19,045
$11,740 255,218 $8,857 750 - - - - $11,740
255,218
kWh
$8,857
750
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,420
Cost:
$456
$1,420 30,872 - - - - - - $1,420
30,872
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$42,983
Cost:
$7,127
$(-961) (-20,888) $(-1,057) (-90) - - $45,000 - $(-961)
(-20,888)
kWh
$(-1,057)
(-90)
kW-months/year
-
-
$
$45,000
-
$
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$1,517,489
Cost:
$143,275
$(-172,059) (-3,740,409) $(-8,452) (-716) $(-102,000) - $1,800,000 - $(-172,059)
(-3,740,409)
kWh
$(-8,452)
(-716)
kW-months/year
$(-102,000)
-
$
$1,800,000
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$40,098
Cost:
$110,800
$(-3,627) (-78,840) $(-1,275) (-108) - - $45,000 - $(-3,627)
(-78,840)
kWh
$(-1,275)
(-108)
kW-months/year
-
-
$
$45,000
-
$
TOTAL RECOMMENDED Savings:
$1,622,587
Cost:
$280,703
$(-163,487) (-3,554,047) $(-1,926) (-163) $(-102,000) - $1,890,000 - $(-163,487)
(-3,554,047)
kWh
$(-1,926)
(-163)
kW-months/year
$(-102,000)
-
$
$1,890,000
-
$
TOTAL IMPLEMENTED Savings:
$1,622,587
Cost:
$280,703
$(-163,487) (-3,554,047) $(-1,926) (-163) $(-102,000) - $1,890,000 - $(-163,487)
(-3,554,047)
kWh
$(-1,926)
(-163)
kW-months/year
$(-102,000)
-
$
$1,890,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product