IAC logo
IAC Assessment: UF0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2020
Principal Product Equine Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 390,000
Annual Production 26,000 Tons
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,001 1,335,331 kWh $0.07
Electricity Demand $49,615 6,741 kW-months/year $7.36
Electricity Fees $21,896 - $ -
Natural Gas $16,764 4,698 MMBtu $3.57
TOTAL ENERGY COSTS $188,609
RECOMMENDED SAVINGS* $199,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,987
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$41,999
Cost:
$359,360
$41,999 599,987 - - - - - - $41,999
599,987
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$4,454
Cost:
$5,998
$4,454 63,630 - - - - - - $4,454
63,630
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,072
Cost:
$8,274
$3,072 43,879 - - - - - - $3,072
43,879
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,897
Cost:
$1,544
- - $2,897 812 - - - - -
-
kWh
$2,897
812
MMBtu
-
-
$
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,841
Cost:
$378
- - $1,841 516 - - - - -
-
kWh
$1,841
516
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,156
Cost:
$306
$1,156 16,514 - - - - - - $1,156
16,514
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 4.664 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA Savings:
$134,615
Cost:
$11,004
- - - - - - $134,615 - -
-
kWh
-
-
MMBtu
-
-
$
$134,615
-
$
08: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$9,639
Cost:
$725
- - - - $9,639 - - - -
-
kWh
-
-
MMBtu
$9,639
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$199,673
Cost:
$387,589
$50,681 724,010 $4,738 1,328 $9,639 - $134,615 - $50,681
724,010
kWh
$4,738
1,328
MMBtu
$9,639
-
$
$134,615
-
$
TOTAL IMPLEMENTED Savings:
$19,987
Cost:
$8,951
$5,610 80,144 $4,738 1,328 $9,639 - - - $5,610
80,144
kWh
$4,738
1,328
MMBtu
$9,639
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost