IAC logo
IAC Assessment: UF0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 1,314,968
Annual Production 2,829,428 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $654,101 15,542,090 kWh $0.04
Electricity Demand $380,874 27,245 kW-months/year $13.98
Electricity Fees $30,120 - $ -
TOTAL ENERGY COSTS $1,065,095
RECOMMENDED SAVINGS* $197,120 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $197,120
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Electricity Usage Electricity Demand Primary Raw Material
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$72,351
Cost:
$83,616
$45,694 1,087,946 $26,657 1,907 - - $45,694
1,087,946
kWh
$26,657
1,907
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$23,651
Cost:
$18,000
$23,651 563,119 - - - - $23,651
563,119
kWh
-
-
kW-months/year
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$22,414
Cost:
$51,208
$22,414 533,667 - - - - $22,414
533,667
kWh
-
-
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,673
Cost:
$5,569
$4,673 111,265 - - - - $4,673
111,265
kWh
-
-
kW-months/year
-
-
$
05: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$65,277
Cost:
$10,000
$65,277 1,554,209 - - - - $65,277
1,554,209
kWh
-
-
kW-months/year
-
-
$
06: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$8,754
Cost:
-
- - - - $8,754 - -
-
kWh
-
-
kW-months/year
$8,754
-
$
TOTAL RECOMMENDED Savings:
$197,120
Cost:
$168,393
$161,709 3,850,206 $26,657 1,907 $8,754 - $161,709
3,850,206
kWh
$26,657
1,907
kW-months/year
$8,754
-
$
TOTAL IMPLEMENTED Savings:
$197,120
Cost:
$168,393
$161,709 3,850,206 $26,657 1,907 $8,754 - $161,709
3,850,206
kWh
$26,657
1,907
kW-months/year
$8,754
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Raw Material Electricity Usage Electricity Demand Primary Raw Material