Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Fire Trucks
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 480
Plant Area (Sq.Ft.) 285,596
Annual Production 423 Units
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,555 4,992,261 kWh $0.05
Electricity Demand $169,631 14,502 kW-months/year $11.70
Electricity Fees $10,376 - $ -
Natural Gas $27,805 7,462 MMBtu $3.73
LPG $15,932 823 MMBtu $19.37
Fuel Oil #1 $130,362 6,384 MMBtu $20.42
TOTAL ENERGY COSTS $581,661
RECOMMENDED SAVINGS* $118,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes By-product Production Electricity Usage Electricity Demand Personnel Changes By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$56,857
Cost:
$359,360
$28,827 626,668 $28,030 2,400 - - - - $28,827
626,668
kWh
$28,030
2,400
kW-months/year
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$27,950
Cost:
$26,859
$16,075 349,458 $11,875 1,015 - - - - $16,075
349,458
kWh
$11,875
1,015
kW-months/year
-
-
$
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$4,159
Cost:
$10,627
$4,159 90,415 - - - - - - $4,159
90,415
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,152
Cost:
$3,218
$4,152 90,265 - - - - - - $4,152
90,265
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,007
Cost:
$8,760
$4,007 87,113 - - - - - - $4,007
87,113
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,414
Cost:
$756
$3,414 74,210 - - - - - - $3,414
74,210
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,245
Cost:
$11,975
- - - - - - $12,245 - -
-
kWh
-
-
kW-months/year
-
-
$
$12,245
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$5,635
Cost:
$4,650
- - - - $5,635 - - - -
-
kWh
-
-
kW-months/year
$5,635
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$118,419
Cost:
$426,205
$60,634 1,318,129 $39,905 3,415 $5,635 - $12,245 - $60,634
1,318,129
kWh
$39,905
3,415
kW-months/year
$5,635
-
$
$12,245
-
$
TOTAL IMPLEMENTED Savings:
$118,419
Cost:
$426,205
$60,634 1,318,129 $39,905 3,415 $5,635 - $12,245 - $60,634
1,318,129
kWh
$39,905
3,415
kW-months/year
$5,635
-
$
$12,245
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes By-product Production Electricity Usage Electricity Demand Personnel Changes By-product Production