IAC Assessment: UF0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Insulated Panels
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 93
Plant Area (Sq.Ft.) 197,000
Annual Production 15,716,000 Thousand Feet
Production Hrs. Annual 5,616
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,388 2,049,157 kWh $0.07
Electricity Demand $58,978 9,328 kW-months/year $6.32
Electricity Fees $39,058 - $ -
Natural Gas $68,095 9,374 MMBtu $7.26
LPG $36,612 1,374 MMBtu $26.65
TOTAL ENERGY COSTS $372,131
RECOMMENDED SAVINGS* $201,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,607
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$133,034
Cost:
$448,875
$178,358 2,512,079 $26,557 4,200 $84,270 11,601 $(-156,151) - - - $178,358
2,512,079
kWh
$26,557
4,200
kW-months/year
$84,270
11,601
MMBtu
$(-156,151)
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,027
Cost:
$20,000
- - - - $17,027 2,344 - - - - -
-
kWh
-
-
kW-months/year
$17,027
2,344
MMBtu
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$14,312
Cost:
$11,024
$10,184 143,441 $4,128 653 - - - - - - $10,184
143,441
kWh
$4,128
653
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$8,425
Cost:
$36,450
$8,425 118,657 - - - - - - - - $8,425
118,657
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,229
Cost:
-
$4,229 59,557 - - - - - - - - $4,229
59,557
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,086
Cost:
$356
$4,086 57,554 - - - - - - - - $4,086
57,554
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$15,247
Cost:
$4,480
$(-5,794) (-81,600) $(-799) (-126) - - - - $21,840 - $(-5,794)
(-81,600)
kWh
$(-799)
(-126)
kW-months/year
-
-
MMBtu
-
-
$
$21,840
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$5,274
Cost:
-
- - - - - - $5,274 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,274
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$201,634
Cost:
$521,185
$199,488 2,809,688 $29,886 4,726 $101,297 13,945 $(-150,877) - $21,840 - $199,488
2,809,688
kWh
$29,886
4,726
kW-months/year
$101,297
13,945
MMBtu
$(-150,877)
-
$
$21,840
-
$
TOTAL IMPLEMENTED Savings:
$24,607
Cost:
$4,836
$(-1,708) (-24,046) $(-799) (-126) - - $5,274 - $21,840 - $(-1,708)
(-24,046)
kWh
$(-799)
(-126)
kW-months/year
-
-
MMBtu
$5,274
-
$
$21,840
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product