Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2023 |
Principal Product | Bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 256,000 |
Annual Production | 36,605 Tons |
Production Hrs. Annual | 2,080 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $800,718 | 11,212,200 | kWh | $0.07 |
Electricity Demand | $215,574 | 22,507 | kW-months/year | $9.58 |
Electricity Fees | $162,622 | - | $ | - |
Natural Gas | $505,312 | 60,931 | MMBtu | $8.29 |
TOTAL ENERGY COSTS | $1,684,226 | |||
RECOMMENDED SAVINGS* | $343,230 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $242,066 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $101,164 Cost: $60,322 |
$79,607 | 1,121,220 | $21,557 | 2,251 | - | - | - | - | - | - |
$79,607 1,121,220 kWh |
$21,557 2,251 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $90,544 Cost: $67,849 |
$90,544 | 1,275,264 | - | - | - | - | - | - | - | - |
$90,544 1,275,264 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $16,705 Cost: $11,574 |
$16,705 | 235,289 | - | - | - | - | - | - | - | - |
$16,705 235,289 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $31,115 Cost: $12,420 |
$(-514) | (-7,245) | $(-403) | (-42) | - | - | - | - | $32,032 | - |
$(-514) (-7,245) kWh |
$(-403) (-42) kW-months/year |
- - MMBtu |
- - Tgal |
$32,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $10,955 Cost: $25,440 |
$10,955 | 154,295 | - | - | - | - | - | - | - | - |
$10,955 154,295 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8117 INSTALL SUB-METERING EQUIPMENT |
Savings: $10,106 Cost: $11,100 |
- | - | - | - | $10,106 | 1,219 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,106 1,219 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $3,034 Cost: $528 |
- | - | - | - | $2,877 | 347 | $157 | 35 | - | - |
- - kWh |
- - kW-months/year |
$2,877 347 MMBtu |
$157 35 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $79,607 Cost: $10,000 |
$79,607 | 1,121,200 | - | - | - | - | - | - | - | - |
$79,607 1,121,200 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $343,230 Cost: $199,233 |
$276,904 | 3,900,023 | $21,154 | 2,209 | $12,983 | 1,566 | $157 | 35 | $32,032 | - | $276,904 3,900,023 kWh |
$21,154 2,209 kW-months/year |
$12,983 1,566 MMBtu |
$157 35 Tgal |
$32,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $242,066 Cost: $138,911 |
$197,297 | 2,778,803 | $(-403) | (-42) | $12,983 | 1,566 | $157 | 35 | $32,032 | - | $197,297 2,778,803 kWh |
$(-403) (-42) kW-months/year |
$12,983 1,566 MMBtu |
$157 35 Tgal |
$32,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Personnel Changes |