IAC logo
IAC Assessment: UF0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Precision Cutting Tools
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 37,000
Annual Production 2,300,880 Units
Production Hrs. Annual 6,188
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,255 3,407,653 kWh $0.09
Electricity Demand $99,108 7,701 kW-months/year $12.87
Electricity Fees $70,979 - $ -
TOTAL ENERGY COSTS $483,342
RECOMMENDED SAVINGS* $256,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$108,899
Cost:
$322,608
$59,482 646,542 $49,417 3,840 - - - - $59,482
646,542
kWh
$49,417
3,840
kW-months/year
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$28,883
Cost:
$18,333
$21,945 238,536 $6,938 539 - - - - $21,945
238,536
kWh
$6,938
539
kW-months/year
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$24,012
Cost:
$25,400
$24,012 261,006 - - - - - - $24,012
261,006
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$9,119
Cost:
$36,000
$5,456 59,300 $3,663 285 - - - - $5,456
59,300
kWh
$3,663
285
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,345
Cost:
$2,330
$4,345 47,232 - - - - - - $4,345
47,232
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$2,691
Cost:
$5,108
$2,691 29,275 - - - - - - $2,691
29,275
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,062
Cost:
$7,200
$2,062 22,409 - - - - - - $2,062
22,409
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,315
Cost:
$4,000
$1,315 14,292 - - - - - - $1,315
14,292
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$54,895
Cost:
-
- - - - - - $54,895 - -
-
kWh
-
-
kW-months/year
-
-
$
$54,895
-
$
10: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$15,675
Cost:
$25,000
$15,675 170,383 - - - - - - $15,675
170,383
kWh
-
-
kW-months/year
-
-
$
-
-
$
11: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$4,482
Cost:
$3,330
- - - - $4,482 - - - -
-
kWh
-
-
kW-months/year
$4,482
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$256,378
Cost:
$449,309
$136,983 1,488,975 $60,018 4,664 $4,482 - $54,895 - $136,983
1,488,975
kWh
$60,018
4,664
kW-months/year
$4,482
-
$
$54,895
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost