IAC logo
IAC Assessment: UF0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Encapsulated Pills and Active Pharmaceutical Ingredients
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 42,506
Annual Production 3,040,800 Units
Production Hrs. Annual 4,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,180 3,859,020 kWh $0.04
Electricity Demand $127,172 7,557 kW-months/year $16.83
Electricity Fees $52,205 - $ -
Natural Gas $35,108 6,582 MMBtu $5.33
TOTAL ENERGY COSTS $387,724
RECOMMENDED SAVINGS* $97,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$19,980
Cost:
$20,761
$11,075 270,131 $8,905 529 - - $11,075
270,131
kWh
$8,905
529
kW-months/year
-
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$16,402
Cost:
$72,000
$7,739 188,760 $8,663 515 - - $7,739
188,760
kWh
$8,663
515
kW-months/year
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$8,759
Cost:
$32,640
$10,265 250,370 $(-1,506) (-90) - - $10,265
250,370
kWh
$(-1,506)
(-90)
kW-months/year
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,567
Cost:
$9,248
$5,567 135,771 - - - - $5,567
135,771
kWh
-
-
kW-months/year
-
-
$
05: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$3,491
Cost:
-
$3,491 85,140 - - - - $3,491
85,140
kWh
-
-
kW-months/year
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,094
Cost:
$2,000
$1,094 26,676 - - - - $1,094
26,676
kWh
-
-
kW-months/year
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,019
Cost:
$2,949
$1,019 24,861 - - - - $1,019
24,861
kWh
-
-
kW-months/year
-
-
$
08: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$41,600
Cost:
$98,000
- - - - $41,600 - -
-
kWh
-
-
kW-months/year
$41,600
-
$
TOTAL RECOMMENDED Savings:
$97,912
Cost:
$237,598
$40,250 981,709 $16,062 955 $41,600 - $40,250
981,709
kWh
$16,062
955
kW-months/year
$41,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes