IAC logo
IAC Assessment: UF0628
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0628
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Plastic Bottle Caps
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2353 - Hats, Caps, And Millinery
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 86,000
Annual Production 2,255,400,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $551,813 8,161,649 kWh $0.07
Electricity Demand $65,814 17,271 kW-months/year $3.81
Electricity Fees $46,080 - $ -
TOTAL ENERGY COSTS $663,707
RECOMMENDED SAVINGS* $275,123 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$45,801
Cost:
$322,608
$42,142 619,742 $3,659 960 - - $42,142
619,742
kWh
$3,659
960
kW-months/year
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$43,459
Cost:
$43,906
$38,849 571,315 $4,610 1,210 - - $38,849
571,315
kWh
$4,610
1,210
kW-months/year
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,464
Cost:
$25,640
$10,064 147,996 $2,400 630 - - $10,064
147,996
kWh
$2,400
630
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,671
Cost:
$41,856
$10,671 156,931 - - - - $10,671
156,931
kWh
-
-
kW-months/year
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$4,580
Cost:
$16,608
$4,921 72,362 $(-341) (-90) - - $4,921
72,362
kWh
$(-341)
(-90)
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,938
Cost:
-
$3,938 57,908 - - - - $3,938
57,908
kWh
-
-
kW-months/year
-
-
$
07: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$3,937
Cost:
$18,930
$3,937 57,908 - - - - $3,937
57,908
kWh
-
-
kW-months/year
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,783
Cost:
$6,000
$2,783 40,927 - - - - $2,783
40,927
kWh
-
-
kW-months/year
-
-
$
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,115
Cost:
$1,235
$1,115 16,992 - - - - $1,115
16,992
kWh
-
-
kW-months/year
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$514
Cost:
$1,235
$514 7,560 - - - - $514
7,560
kWh
-
-
kW-months/year
-
-
$
11: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$141,216
Cost:
$3,660
$(-3,699) (-54,400) $(-321) (-84) $145,236 - $(-3,699)
(-54,400)
kWh
$(-321)
(-84)
kW-months/year
$145,236
-
$
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$4,645
Cost:
$1,476
$4,645 68,302 - - - - $4,645
68,302
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$275,123
Cost:
$483,154
$119,880 1,763,543 $10,007 2,626 $145,236 - $119,880
1,763,543
kWh
$10,007
2,626
kW-months/year
$145,236
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes