IAC logo
IAC Assessment: UF0629
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0629
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Active Pharmaceutical Ingredients
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 57,900
Annual Production 2,425 Pounds
Production Hrs. Annual 4,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,037 2,771,720 kWh $0.04
Electricity Demand $85,916 5,126 kW-months/year $16.76
Electricity Fees $29,715 - $ -
TOTAL ENERGY COSTS $231,668
RECOMMENDED SAVINGS* $84,322 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$42,690
Cost:
$322,608
$26,599 633,319 $16,091 960 $26,599
633,319
kWh
$16,091
960
kW-months/year
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$14,163
Cost:
$14,913
$8,149 194,020 $6,014 359 $8,149
194,020
kWh
$6,014
359
kW-months/year
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$14,977
Cost:
$47,000
$7,797 185,640 $7,180 428 $7,797
185,640
kWh
$7,180
428
kW-months/year
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,306
Cost:
$25,400
$8,306 197,756 - - $8,306
197,756
kWh
-
-
kW-months/year
05: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$1,706
Cost:
$754
$1,706 40,620 - - $1,706
40,620
kWh
-
-
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,163
Cost:
-
$1,163 27,693 - - $1,163
27,693
kWh
-
-
kW-months/year
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,103
Cost:
$455
$1,103 26,259 - - $1,103
26,259
kWh
-
-
kW-months/year
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$214
Cost:
$342
$214 5,099 - - $214
5,099
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$84,322
Cost:
$411,472
$55,037 1,310,406 $29,285 1,747 $55,037
1,310,406
kWh
$29,285
1,747
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand