Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2025 |
Principal Product | Turbine Blades |
NAICS | 333611 - Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3511 - Turbines And Turbine Generator Sets |
Sales | $50,000,000-$100,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 64,000 |
Annual Production | 180,000 Units |
Production Hrs. Annual | 2,080 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $127,767 | 2,872,479 | kWh | $0.04 |
Electricity Demand | $178,672 | 9,709 | kW-months/year | $18.40 |
Electricity Fees | $45,285 | - | $ | - |
Natural Gas | $13,317 | 779 | MMBtu | $17.10 |
TOTAL ENERGY COSTS | $365,041 | |||
RECOMMENDED SAVINGS* | $192,439 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $45,516 Cost: $322,608 |
$27,849 | 632,923 | $17,667 | 960 | - | - |
$27,849 632,923 kWh |
$17,667 960 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $30,505 Cost: $15,454 |
$12,639 | 287,248 | $17,866 | 971 | - | - |
$12,639 287,248 kWh |
$17,866 971 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,030 Cost: $500 |
$2,030 | 46,141 | - | - | - | - |
$2,030 46,141 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $1,216 Cost: $4,665 |
$1,216 | 27,641 | - | - | - | - |
$1,216 27,641 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,201 Cost: - |
$1,201 | 27,300 | - | - | - | - |
$1,201 27,300 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,095 Cost: $4,000 |
$1,095 | 24,879 | - | - | - | - |
$1,095 24,879 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $65,876 Cost: $2,873 |
$(-1,211) | (-27,520) | $(-1,163) | (-63) | $68,250 | - |
$(-1,211) (-27,520) kWh |
$(-1,163) (-63) kW-months/year |
$68,250 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $45,000 Cost: $1,900 |
- | - | - | - | $45,000 | - |
- - kWh |
- - kW-months/year |
$45,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $192,439 Cost: $352,000 |
$44,819 | 1,018,612 | $34,370 | 1,868 | $113,250 | - | $44,819 1,018,612 kWh |
$34,370 1,868 kW-months/year |
$113,250 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |