IAC logo
IAC Assessment: UF0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Turbine Blades
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 64,000
Annual Production 180,000 Units
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,767 2,872,479 kWh $0.04
Electricity Demand $178,672 9,709 kW-months/year $18.40
Electricity Fees $45,285 - $ -
Natural Gas $13,317 779 MMBtu $17.10
TOTAL ENERGY COSTS $365,041
RECOMMENDED SAVINGS* $192,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$45,516
Cost:
$322,608
$27,849 632,923 $17,667 960 - - $27,849
632,923
kWh
$17,667
960
kW-months/year
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$30,505
Cost:
$15,454
$12,639 287,248 $17,866 971 - - $12,639
287,248
kWh
$17,866
971
kW-months/year
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,030
Cost:
$500
$2,030 46,141 - - - - $2,030
46,141
kWh
-
-
kW-months/year
-
-
$
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$1,216
Cost:
$4,665
$1,216 27,641 - - - - $1,216
27,641
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,201
Cost:
-
$1,201 27,300 - - - - $1,201
27,300
kWh
-
-
kW-months/year
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,095
Cost:
$4,000
$1,095 24,879 - - - - $1,095
24,879
kWh
-
-
kW-months/year
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$65,876
Cost:
$2,873
$(-1,211) (-27,520) $(-1,163) (-63) $68,250 - $(-1,211)
(-27,520)
kWh
$(-1,163)
(-63)
kW-months/year
$68,250
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$45,000
Cost:
$1,900
- - - - $45,000 - -
-
kWh
-
-
kW-months/year
$45,000
-
$
TOTAL RECOMMENDED Savings:
$192,439
Cost:
$352,000
$44,819 1,018,612 $34,370 1,868 $113,250 - $44,819
1,018,612
kWh
$34,370
1,868
kW-months/year
$113,250
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes