IAC logo
IAC Assessment: UK1315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2013
Principal Product Industrial Resistors
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 65,000
Annual Production 285,400 Pieces
Production Hrs. Annual 4,160
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,102 1,103,517 kWh $0.06
Electricity Demand $28,189 3,817 kW-months/year $7.39
Electricity Fees $14,576 - $ -
Natural Gas $11,856 1,869 MMBtu $6.34
TOTAL ENERGY COSTS $118,723
RECOMMENDED SAVINGS* $40,889 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,240
Cost:
$1,930
$974 16,800 $266 36 - - - - - - $974
16,800
kWh
$266
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$943
Cost:
$2,750
$553 9,526 $390 53 - - - - - - $553
9,526
kWh
$390
53
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,528
Cost:
-
$2,528 43,587 - - - - - - - - $2,528
43,587
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$633
Cost:
-
$633 10,926 - - - - - - - - $633
10,926
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$261
Cost:
-
$208 3,590 $53 7 - - - - - - $208
3,590
kWh
$53
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,766
Cost:
$2,000
$446 7,680 $120 16 - - $1,200 190 - - $446
7,680
kWh
$120
16
kW-months/year
-
-
$
$1,200
190
MMBtu
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$26,356
Cost:
$52,000
$4,054 69,888 $2,302 312 - - - - $20,000 - $4,054
69,888
kWh
$2,302
312
kW-months/year
-
-
$
-
-
MMBtu
$20,000
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,395
Cost:
$1,200
$1,045 18,021 - - - - $1,350 213 - - $1,045
18,021
kWh
-
-
kW-months/year
-
-
$
$1,350
213
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,767
Cost:
$1,600
- - - - $4,767 - - - - - -
-
kWh
-
-
kW-months/year
$4,767
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$40,889
Cost:
$61,480
$10,441 180,018 $3,131 424 $4,767 - $2,550 403 $20,000 - $10,441
180,018
kWh
$3,131
424
kW-months/year
$4,767
-
$
$2,550
403
MMBtu
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$11,195
Cost:
$5,530
$4,789 82,583 $439 60 $4,767 - $1,200 190 - - $4,789
82,583
kWh
$439
60
kW-months/year
$4,767
-
$
$1,200
190
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes