IAC Assessment: UK1317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2013
Principal Product Oral Solid Dosage Drugs
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 100,000
Annual Production 440,925 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,313 14,067,000 kWh $0.03
Electricity Demand $356,979 27,598 kW-months/year $12.93
Electricity Fees $131,240 - $ -
Natural Gas $343,978 71,099 MMBtu $4.84
TOTAL ENERGY COSTS $1,322,510
RECOMMENDED SAVINGS* $191,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $154,048
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$139,142
Cost:
$342,000
$49,934 1,430,768 $26,439 2,044 - - $62,769 12,630 $49,934
1,430,768
kWh
$26,439
2,044
kW-months/year
-
-
$
$62,769
12,630
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,706
Cost:
$17,700
- - - - $11,706 - - - -
-
kWh
-
-
kW-months/year
$11,706
-
$
-
-
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$15,719
Cost:
$35,000
$15,719 450,398 - - - - - - $15,719
450,398
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$12,899
Cost:
-
$12,899 369,600 - - - - - - $12,899
369,600
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,519
Cost:
-
$5,570 159,600 $2,949 228 - - - - $5,570
159,600
kWh
$2,949
228
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$3,200
Cost:
$1,900
$3,200 92,490 - - - - - - $3,200
92,490
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$191,185
Cost:
$396,600
$87,322 2,502,856 $29,388 2,272 $11,706 - $62,769 12,630 $87,322
2,502,856
kWh
$29,388
2,272
kW-months/year
$11,706
-
$
$62,769
12,630
MMBtu
TOTAL IMPLEMENTED Savings:
$154,048
Cost:
$361,600
$53,134 1,523,258 $26,439 2,044 $11,706 - $62,769 12,630 $53,134
1,523,258
kWh
$26,439
2,044
kW-months/year
$11,706
-
$
$62,769
12,630
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas