Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2014
Principal Product Sound Insulation Material
NAICS 327993 - Mineral Wool Manufacturing
SIC 3296 - Mineral Wool
Sales $50,000,000-$100,000,000
# of Employees 380
Plant Area (Sq.Ft.) 250,000
Annual Production 11,700,000 Pieces
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,044,255 27,516,000 kWh $0.04
Electricity Demand $418,386 49,867 kW-months/year $8.39
Electricity Fees $137,729 - $ -
Natural Gas $997,714 138,270 MMBtu $7.22
TOTAL ENERGY COSTS $3,165,084
RECOMMENDED SAVINGS* $904,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,448
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$15,613
Cost:
$3,894
$11,658 306,789 $3,955 438 - - - - - - $11,658
306,789
kWh
$3,955
438
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,448
Cost:
$2,000
$6,448 169,680 - - - - - - - - $6,448
169,680
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,600
Cost:
$17,000
$7,600 200,000 - - - - - - - - $7,600
200,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$40,960
Cost:
$204,000
$889 23,400 - - - - $40,071 5,550 - - $889
23,400
kWh
-
-
kW-months/year
-
-
$
$40,071
5,550
MMBtu
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$36,000
Cost:
$32,528
- - - - $36,000 - - - - - -
-
kWh
-
-
kW-months/year
$36,000
-
$
-
-
MMBtu
-
-
lb
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$217,346
Cost:
$140,476
- - - - - - $217,346 30,103 - - -
-
kWh
-
-
kW-months/year
-
-
$
$217,346
30,103
MMBtu
-
-
lb
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$580,500
Cost:
$386,500
$8,748 230,213 $4,752 526 - - - - $567,000 1,260,000 $8,748
230,213
kWh
$4,752
526
kW-months/year
-
-
$
-
-
MMBtu
$567,000
1,260,000
lb
TOTAL RECOMMENDED Savings:
$904,467
Cost:
$786,398
$35,343 930,082 $8,707 964 $36,000 - $257,417 35,653 $567,000 1,260,000 $35,343
930,082
kWh
$8,707
964
kW-months/year
$36,000
-
$
$257,417
35,653
MMBtu
$567,000
1,260,000
lb
TOTAL IMPLEMENTED Savings:
$42,448
Cost:
$34,528
$6,448 169,680 - - $36,000 - - - - - $6,448
169,680
kWh
-
-
kW-months/year
$36,000
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)