IAC logo
IAC Assessment: UK1505
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1505
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2015
Principal Product Cookies
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $100,000,000-$500,000,000
# of Employees 265
Plant Area (Sq.Ft.) 220,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $459,918 9,007,836 kWh $0.05
Electricity Demand $118,000 19,251 kW-months/year $6.13
Electricity Fees $268,788 - $ -
Natural Gas $278,120 50,233 MMBtu $5.54
TOTAL ENERGY COSTS $1,124,826
RECOMMENDED SAVINGS* $84,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,138
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,028
Cost:
$1,750
$5,998 117,600 $1,030 168 - - - - $5,998
117,600
kWh
$1,030
168
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,107
Cost:
$266
$2,107 41,304 - - - - - - $2,107
41,304
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,528
Cost:
$4,500
$2,160 42,358 $368 60 - - - - $2,160
42,358
kWh
$368
60
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,753
Cost:
$3,800
$1,753 34,367 - - - - - - $1,753
34,367
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,998
Cost:
-
$7,998 156,830 - - - - - - $7,998
156,830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4152 USE ONLY CERTIFIED MOTOR REPAIR SHOPS Savings:
$1,747
Cost:
$635
$1,747 34,265 - - - - - - $1,747
34,265
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$296
Cost:
$61
- - - - - - $296 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$296
-
$
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$54,447
Cost:
$42,474
- - - - $54,447 9,828 - - -
-
kWh
-
-
kW-months/year
$54,447
9,828
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,562
Cost:
$3,824
- - - - $3,562 643 - - -
-
kWh
-
-
kW-months/year
$3,562
643
MMBtu
-
-
$
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$548
Cost:
$276
- - - - $548 99 - - -
-
kWh
-
-
kW-months/year
$548
99
MMBtu
-
-
$
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,571
Cost:
$5,110
- - - - $2,571 464 - - -
-
kWh
-
-
kW-months/year
$2,571
464
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$84,585
Cost:
$62,696
$21,763 426,724 $1,398 228 $61,128 11,034 $296 - $21,763
426,724
kWh
$1,398
228
kW-months/year
$61,128
11,034
MMBtu
$296
-
$
TOTAL IMPLEMENTED Savings:
$30,138
Cost:
$20,222
$21,763 426,724 $1,398 228 $6,681 1,206 $296 - $21,763
426,724
kWh
$1,398
228
kW-months/year
$6,681
1,206
MMBtu
$296
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost