IAC logo
IAC Assessment: UL0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Paint Dispersions
NAICS n/a
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 12
Plant Area (Sq.Ft.) 62,000
Annual Production 400 Thousand Gallons
Production Hrs. Annual 2,500
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,380 1,473,036 kWh $0.06
Natural Gas $24,124 6,106 MMBtu $3.95
TOTAL ENERGY COSTS $111,504
RECOMMENDED SAVINGS* $38,416 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$922
Cost:
-
$922 15,533 - - $922
15,533
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,808
Cost:
$4,595
$3,808 64,185 - - $3,808
64,185
kWh
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,418
Cost:
$5,400
$11,418 - - - $11,418
-
kWh
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,564
Cost:
$10,120
$17,564 - - - $17,564
-
kWh
-
-
MMBtu
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$4,704
Cost:
$20,700
- - $4,704 2,291 -
-
kWh
$4,704
2,291
MMBtu
TOTAL RECOMMENDED Savings:
$38,416
Cost:
$40,815
$33,712 79,718 $4,704 2,291 $33,712
79,718
kWh
$4,704
2,291
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas