IAC logo
IAC Assessment: UL0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1995
Principal Product Offset Lithographic Printings
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 44,100
Annual Production 2,500 Tons
Production Hrs. Annual 6,240
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,603 1,423,212 kWh $0.06
Natural Gas $2,318 517 MMBtu $4.48
TOTAL ENERGY COSTS $143,331
RECOMMENDED SAVINGS* $31,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,449
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ gal $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,583
Cost:
$50
$9,583 163,247 - - - - - - $9,583
163,247
kWh
-
-
gal
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$191
Cost:
$20
$191 3,224 - - - - - - $191
3,224
kWh
-
-
gal
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,580
Cost:
$2,038
$3,580 60,961 - - - - - - $3,580
60,961
kWh
-
-
gal
-
-
lb
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,678
Cost:
-
$2,678 - - - - - - - $2,678
-
kWh
-
-
gal
-
-
lb
-
-
$
05: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$5,575
Cost:
$11,265
- - $1,575 315 - - $4,000 - -
-
kWh
$1,575
315
gal
-
-
lb
$4,000
-
$
06: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$10,120
Cost:
-
- - - - $10,120 3,455 - - -
-
kWh
-
-
gal
$10,120
3,455
lb
-
-
$
07: 3.5241 SELL USED PLATES TO AN ALUMINUM RECYCLER Savings:
$40
Cost:
$75
- - - - $40 3,312 - - -
-
kWh
-
-
gal
$40
3,312
lb
-
-
$
TOTAL RECOMMENDED Savings:
$31,767
Cost:
$13,448
$16,032 227,432 $1,575 315 $10,160 6,767 $4,000 - $16,032
227,432
kWh
$1,575
315
gal
$10,160
6,767
lb
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$6,449
Cost:
$2,058
$6,449 64,185 - - - - - - $6,449
64,185
kWh
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ gal $ lb $ $
Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost