Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1995 |
Principal Product | Offset Lithographic Printings |
NAICS | n/a |
SIC | 2759 - Commercial Printing, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 44,100 |
Annual Production | 2,500 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,603 | 1,423,212 | kWh | $0.06 |
Natural Gas | $2,318 | 517 | MMBtu | $4.48 |
TOTAL ENERGY COSTS | $143,331 | |||
RECOMMENDED SAVINGS* | $31,767 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,449 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,583 Cost: $50 |
$9,583 | 163,247 | - | - | - | - | - | - |
$9,583 163,247 kWh |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $191 Cost: $20 |
$191 | 3,224 | - | - | - | - | - | - |
$191 3,224 kWh |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,580 Cost: $2,038 |
$3,580 | 60,961 | - | - | - | - | - | - |
$3,580 60,961 kWh |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $2,678 Cost: - |
$2,678 | - | - | - | - | - | - | - |
$2,678 - kWh |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT |
Savings: $5,575 Cost: $11,265 |
- | - | $1,575 | 315 | - | - | $4,000 | - |
- - kWh |
$1,575 315 gal |
- - lb |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT |
Savings: $10,120 Cost: - |
- | - | - | - | $10,120 | 3,455 | - | - |
- - kWh |
- - gal |
$10,120 3,455 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5241 SELL USED PLATES TO AN ALUMINUM RECYCLER |
Savings: $40 Cost: $75 |
- | - | - | - | $40 | 3,312 | - | - |
- - kWh |
- - gal |
$40 3,312 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,767 Cost: $13,448 |
$16,032 | 227,432 | $1,575 | 315 | $10,160 | 6,767 | $4,000 | - | $16,032 227,432 kWh |
$1,575 315 gal |
$10,160 6,767 lb |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,449 Cost: $2,058 |
$6,449 | 64,185 | - | - | - | - | - | - | $6,449 64,185 kWh |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost |