IAC Assessment: UL0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Diesel Engine Components and Inflatable Restraints
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 450,000
Annual Production 20,000 Pieces
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,092 12,067,702 kWh $0.02
Electricity Demand $237,949 24,998 kW-months/year $9.52
Natural Gas $411,770 122,457 MMBtu $3.36
TOTAL ENERGY COSTS $1,007,149
RECOMMENDED SAVINGS* $73,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,663
Cost:
$25,452
$2,667 153,869 $1,996 300 - - - - - - - - $2,667
153,869
kWh
$1,996
300
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,585
Cost:
$20
$757 43,669 $828 87 - - - - - - - - $757
43,669
kWh
$828
87
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,403
Cost:
$2,000
- - - - $5,403 1,608 - - - - - - -
-
kWh
-
-
kW-months/year
$5,403
1,608
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,000
Cost:
-
- - - - - - - - - - $5,000 63,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,000
63,000
lb
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$770
Cost:
-
- - - - - - - - - - $770 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$770
-
lb
06: 3.4155 METER WASTE WATER Savings:
$26,500
Cost:
$3,500
- - - - - - $26,500 30,200,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,500
30,200,000
Tgal
-
-
gal
-
-
lb
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$29,936
Cost:
$16,000
- - - - - - - - $22,700 5,491 $7,236 10,400 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$22,700
5,491
gal
$7,236
10,400
lb
TOTAL RECOMMENDED Savings:
$73,857
Cost:
$46,972
$3,424 197,538 $2,824 387 $5,403 1,608 $26,500 30,200,000 $22,700 5,491 $13,006 73,400 $3,424
197,538
kWh
$2,824
387
kW-months/year
$5,403
1,608
MMBtu
$26,500
30,200,000
Tgal
$22,700
5,491
gal
$13,006
73,400
lb
TOTAL IMPLEMENTED Savings:
$30,706
Cost:
$16,000
- - - - - - - - $22,700 5,491 $8,006 10,400 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$22,700
5,491
gal
$8,006
10,400
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz)