IAC logo
IAC Assessment: UL0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1996
Principal Product Smokeless Tobacco
NAICS n/a
SIC 2131 - Chewing And Smoking Tobacco
Sales $100,000,000-$500,000,000
# of Employees 375
Plant Area (Sq.Ft.) 400,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $563,487 18,521,688 kWh $0.03
Electricity Demand $66,021 50,084 kW-months/year $1.32
Natural Gas $525,939 206,140 MMBtu $2.55
TOTAL ENERGY COSTS $1,336,447
RECOMMENDED SAVINGS* $54,072 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,145
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$880
Cost:
$100
$700 22,860 $180 78 - - - - - - $700
22,860
kWh
$180
78
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,620
Cost:
$12,140
$4,120 135,404 $500 218 - - - - - - $4,120
135,404
kWh
$500
218
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$16,145
Cost:
$2,000
- - - - $16,145 6,331 - - - - -
-
kWh
-
-
kW-months/year
$16,145
6,331
MMBtu
-
-
lb
-
-
lb
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$24,250
Cost:
-
- - - - - - $24,250 4,200,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,250
4,200,000
lb
-
-
lb
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,677
Cost:
$572
- - - - - - - - $4,677 790 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,677
790
lb
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,500
Cost:
-
- - - - - - $3,500 1,900,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,500
1,900,000
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$54,072
Cost:
$14,812
$4,820 158,264 $680 296 $16,145 6,331 $27,750 6,100,000 $4,677 790 $4,820
158,264
kWh
$680
296
kW-months/year
$16,145
6,331
MMBtu
$27,750
6,100,000
lb
$4,677
790
lb
TOTAL IMPLEMENTED Savings:
$16,145
Cost:
$2,000
- - - - $16,145 6,331 - - - - -
-
kWh
-
-
kW-months/year
$16,145
6,331
MMBtu
-
-
lb
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)