Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1997
Principal Product Tenderized Wood Veneers
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 7,000 Thousand Feet
Production Hrs. Annual 4,576
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,885 886,577 kWh $0.02
Electricity Demand $25,025 2,604 kW-months/year $9.61
Natural Gas $23,620 5,545 MMBtu $4.26
TOTAL ENERGY COSTS $100,537
RECOMMENDED SAVINGS* $870,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,469
Cost:
$2,216
- - - - - - - - - - - - $4,469 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$4,469
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$429
Cost:
$400
- - - - $429 101 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$429
101
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$249
Cost:
$20
$153 6,155 $96 10 - - - - - - - - - - - - $153
6,155
kWh
$96
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$152
Cost:
$2,683
$80 3,224 $72 8 - - - - - - - - - - - - $80
3,224
kWh
$72
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$6,082
Cost:
-
- - - - - - - - - - $6,082 26,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$6,082
26,400
lb
-
-
$
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$4,390
Cost:
$8,500
- - - - - - $4,390 1,440,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,390
1,440,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$5,206
Cost:
$6,600
- - - - - - - - $5,206 655 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,206
655
gal
-
-
lb
-
-
$
-
-
$
08: 4.214 PURCHASE APPROPRIATELY SIZED MATERIAL Savings:
$569,400
Cost:
-
- - - - - - - - - - - - - - $569,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$569,400
-
$
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$280,000
Cost:
-
- - - - - - - - - - - - $280,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$280,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$870,377
Cost:
$20,419
$233 9,379 $168 18 $429 101 $4,390 1,440,000 $5,206 655 $6,082 26,400 $284,469 - $569,400 - $233
9,379
kWh
$168
18
kW-months/year
$429
101
MMBtu
$4,390
1,440,000
Tgal
$5,206
655
gal
$6,082
26,400
lb
$284,469
-
$
$569,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material