Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1997 |
Principal Product | Tenderized Wood Veneers |
NAICS | n/a |
SIC | 2435 - Hardwood Veneer And Plywood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 7,000 Thousand Feet |
Production Hrs. Annual | 4,576 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $21,885 | 886,577 | kWh | $0.02 |
Electricity Demand | $25,025 | 2,604 | kW-months/year | $9.61 |
Natural Gas | $23,620 | 5,545 | MMBtu | $4.26 |
TOTAL ENERGY COSTS | $100,537 | |||
RECOMMENDED SAVINGS* | $870,377 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $4,469 Cost: $2,216 |
- | - | - | - | - | - | - | - | - | - | - | - | $4,469 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$4,469 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $429 Cost: $400 |
- | - | - | - | $429 | 101 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$429 101 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $249 Cost: $20 |
$153 | 6,155 | $96 | 10 | - | - | - | - | - | - | - | - | - | - | - | - |
$153 6,155 kWh |
$96 10 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $152 Cost: $2,683 |
$80 | 3,224 | $72 | 8 | - | - | - | - | - | - | - | - | - | - | - | - |
$80 3,224 kWh |
$72 8 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $6,082 Cost: - |
- | - | - | - | - | - | - | - | - | - | $6,082 | 26,400 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$6,082 26,400 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $4,390 Cost: $8,500 |
- | - | - | - | - | - | $4,390 | 1,440,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,390 1,440,000 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE |
Savings: $5,206 Cost: $6,600 |
- | - | - | - | - | - | - | - | $5,206 | 655 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$5,206 655 gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.214 PURCHASE APPROPRIATELY SIZED MATERIAL |
Savings: $569,400 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $569,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
$569,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $280,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $280,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$280,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $870,377 Cost: $20,419 |
$233 | 9,379 | $168 | 18 | $429 | 101 | $4,390 | 1,440,000 | $5,206 | 655 | $6,082 | 26,400 | $284,469 | - | $569,400 | - | $233 9,379 kWh |
$168 18 kW-months/year |
$429 101 MMBtu |
$4,390 1,440,000 Tgal |
$5,206 655 gal |
$6,082 26,400 lb |
$284,469 - $ |
$569,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material |