IAC logo
IAC Assessment: UL0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1997
Principal Product Office Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 126,067
Annual Production 52,000 Pieces
Production Hrs. Annual 1,920
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,079 1,066,823 kWh $0.06
TOTAL ENERGY COSTS $63,774
RECOMMENDED SAVINGS* $31,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,104
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
$3,425
$104 1,758 - - - - - - $104
1,758
kWh
-
-
lb
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,848
Cost:
$30
$2,848 48,066 - - - - - - $2,848
48,066
kWh
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$331
Cost:
$238
$331 5,569 - - - - - - $331
5,569
kWh
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$941
Cost:
$20
$941 15,826 - - - - - - $941
15,826
kWh
-
-
lb
-
-
$
-
-
$
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$5,000
Cost:
$3,600
- - - - - - $5,000 - -
-
kWh
-
-
lb
-
-
$
$5,000
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$230
Cost:
-
- - $230 - - - - - -
-
kWh
$230
-
lb
-
-
$
-
-
$
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$22,000
Cost:
$17,758
- - - - $22,000 - - - -
-
kWh
-
-
lb
$22,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,454
Cost:
$25,071
$4,224 71,219 $230 - $22,000 - $5,000 - $4,224
71,219
kWh
$230
-
lb
$22,000
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$5,104
Cost:
$7,025
$104 1,758 - - - - $5,000 - $104
1,758
kWh
-
-
lb
-
-
$
$5,000
-
$
Savings
Cost
$ kWh $ lb $ $ $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Solid Waste (non-haz) Administrative Changes Primary Raw Material