IAC logo
IAC Assessment: UL0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1998
Principal Product Injection Molded Plastic, Plastic Appliance Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 220,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 8,592
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $300,982 12,145,663 kWh $0.02
Electricity Demand $244,027 23,200 kW-months/year $10.52
Electricity Fees $1,722 - $ -
Natural Gas $42,362 8,366 MMBtu $5.06
TOTAL ENERGY COSTS $602,446
RECOMMENDED SAVINGS* $228,379 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,499
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$67,516
Cost:
-
- - $67,516 - - - - - -
-
kWh
$67,516
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,803
Cost:
-
$2,128 97,011 $1,675 160 - - - - $2,128
97,011
kWh
$1,675
160
kW-months/year
-
-
lb
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$28,180
Cost:
-
- - - - $28,180 200,000 - - -
-
kWh
-
-
kW-months/year
$28,180
200,000
lb
-
-
$
04: 4.446 AUTOMATE FINISHING PROCESS Savings:
$128,880
Cost:
-
- - - - - - $128,880 - -
-
kWh
-
-
kW-months/year
-
-
lb
$128,880
-
$
TOTAL RECOMMENDED Savings:
$228,379
Cost:
-
$2,128 97,011 $69,191 160 $28,180 200,000 $128,880 - $2,128
97,011
kWh
$69,191
160
kW-months/year
$28,180
200,000
lb
$128,880
-
$
TOTAL IMPLEMENTED Savings:
$99,499
Cost:
-
$2,128 97,011 $69,191 160 $28,180 200,000 - - $2,128
97,011
kWh
$69,191
160
kW-months/year
$28,180
200,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product