IAC Assessment: UL0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Injection-molded Plastic Pipe Fittings and Valves
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 189
Plant Area (Sq.Ft.) 179,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,500 8,446,659 kWh $0.02
Electricity Demand $146,442 14,442 kW-months/year $10.14
Natural Gas $10,828 1,842 MMBtu $5.88
TOTAL ENERGY COSTS $312,925
RECOMMENDED SAVINGS* $203,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,573
Cost:
$13,951
$1,346 84,701 $1,227 121 - - - - $1,346
84,701
kWh
$1,227
121
kW-months/year
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,059
Cost:
$20
$555 34,877 $504 50 - - - - $555
34,877
kWh
$504
50
kW-months/year
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$160
Cost:
$500
- - - - $160 2,800 - - -
-
kWh
-
-
kW-months/year
$160
2,800
lb
-
-
$
04: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$200,000
Cost:
$75,000
- - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$200,000
-
$
TOTAL RECOMMENDED Savings:
$203,792
Cost:
$89,471
$1,901 119,578 $1,731 171 $160 2,800 $200,000 - $1,901
119,578
kWh
$1,731
171
kW-months/year
$160
2,800
lb
$200,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product