IAC logo
IAC Assessment: UL0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Carbon and stainless steel fabricated products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 75,500
Annual Production 4,465 Tons
Production Hrs. Annual 2,040
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,770 1,127,784 kWh $0.03
Electricity Demand $16,337 3,661 kW-months/year $4.46
Natural Gas $20,302 3,858 MMBtu $5.26
TOTAL ENERGY COSTS $55,422
RECOMMENDED SAVINGS* $178,305 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,326
Cost:
$20
$694 24,033 $632 142 - - - - - - $694
24,033
kWh
$632
142
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,708
Cost:
$8,456
$1,424 48,945 $1,284 288 - - - - - - $1,424
48,945
kWh
$1,284
288
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$16,091
Cost:
$8,165
- - - - - - $16,091 561,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$16,091
561,000
lb
-
-
$
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$200
Cost:
$150
- - - - - - $200 5,300 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$200
5,300
lb
-
-
$
05: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$15,966
Cost:
$1,448
- - - - $15,966 504 - - - - -
-
kWh
-
-
kW-months/year
$15,966
504
gal
-
-
lb
-
-
$
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$32,230
Cost:
$13,000
- - - - $32,230 1,008 - - - - -
-
kWh
-
-
kW-months/year
$32,230
1,008
gal
-
-
lb
-
-
$
07: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$55,904
Cost:
$285,000
- - - - $55,904 1,261 - - - - -
-
kWh
-
-
kW-months/year
$55,904
1,261
gal
-
-
lb
-
-
$
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$53,880
Cost:
-
- - - - - - - - $53,880 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$53,880
-
$
TOTAL RECOMMENDED Savings:
$178,305
Cost:
$316,239
$2,118 72,978 $1,916 430 $104,100 2,773 $16,291 566,300 $53,880 - $2,118
72,978
kWh
$1,916
430
kW-months/year
$104,100
2,773
gal
$16,291
566,300
lb
$53,880
-
$
TOTAL IMPLEMENTED Savings:
$72,554
Cost:
$9,904
$1,424 48,945 $1,284 288 $15,966 504 - - $53,880 - $1,424
48,945
kWh
$1,284
288
kW-months/year
$15,966
504
gal
-
-
lb
$53,880
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Primary Product