IAC Assessment: UL0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1999
Principal Product Automobilr engines and components
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 300
Annual Production 0 Pieces
Production Hrs. Annual 2,250
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,919 3,461,606 kWh $0.03
Electricity Demand $102,533 11,085 kW-months/year $9.25
Natural Gas $49,887 12,680 MMBtu $3.93
TOTAL ENERGY COSTS $260,361
RECOMMENDED SAVINGS* $399,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,394
Cost:
$40
$2,254 83,822 $4,140 448 - - - - $2,254
83,822
kWh
$4,140
448
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,353
Cost:
$500
$1,353 50,410 - - - - - - $1,353
50,410
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,860
Cost:
-
- - - - $2,860 1,296,000 - - -
-
kWh
-
-
kW-months/year
$2,860
1,296,000
lb
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,447
Cost:
-
- - - - - - $1,447 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,447
-
$
05: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$297,462
Cost:
$167,000
- - - - - - $297,462 - -
-
kWh
-
-
kW-months/year
-
-
lb
$297,462
-
$
06: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$83,800
Cost:
$80,000
- - - - - - $83,800 - -
-
kWh
-
-
kW-months/year
-
-
lb
$83,800
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$1,500
Cost:
-
- - - - - - $1,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,500
-
$
08: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$2,893
Cost:
$2,120
- - - - - - $2,893 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,893
-
$
09: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$1,308
Cost:
$2,270
- - - - - - $1,308 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,308
-
$
TOTAL RECOMMENDED Savings:
$399,017
Cost:
$251,930
$3,607 134,232 $4,140 448 $2,860 1,296,000 $388,410 - $3,607
134,232
kWh
$4,140
448
kW-months/year
$2,860
1,296,000
lb
$388,410
-
$
TOTAL IMPLEMENTED Savings:
$95,940
Cost:
$82,660
$3,607 134,232 $4,140 448 - - $88,193 - $3,607
134,232
kWh
$4,140
448
kW-months/year
-
-
lb
$88,193
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost