IAC Assessment: UL0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2000
Principal Product Powder Coated Parts
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 40,000
Annual Production 32,400,000 Pieces
Production Hrs. Annual 7,488
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,497 2,899,766 kWh $0.04
Electricity Demand $38,523 8,076 kW-months/year $4.77
Natural Gas $35,514 5,437 MMBtu $6.53
TOTAL ENERGY COSTS $192,534
RECOMMENDED SAVINGS* $25,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,646
Cost:
$9,827
$1,323 32,532 $323 68 - - - - $1,323
32,532
kWh
$323
68
kW-months/year
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,135
Cost:
$20
$1,718 41,911 $417 88 - - - - $1,718
41,911
kWh
$417
88
kW-months/year
-
-
lb
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$19,623
Cost:
-
- - - - $19,623 126,000 - - -
-
kWh
-
-
kW-months/year
$19,623
126,000
lb
-
-
$
04: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$1,947
Cost:
$60
- - - - - - $1,947 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,947
-
$
TOTAL RECOMMENDED Savings:
$25,351
Cost:
$9,907
$3,041 74,443 $740 156 $19,623 126,000 $1,947 - $3,041
74,443
kWh
$740
156
kW-months/year
$19,623
126,000
lb
$1,947
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost