Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2022
Principal Product Injection molded plastic automotive parts
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466 - Crowns And Closures
Sales $50,000,000-$100,000,000
# of Employees 641
Plant Area (Sq.Ft.) 430,000
Annual Production 43,608,386 Pieces
Production Hrs. Annual 7,200
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $728,207 26,877,600 kWh $0.03
Electricity Demand $1,194,817 53,467 kW-months/year $22.35
Electricity Fees $117,361 - $ -
Natural Gas $32,986 3,324 MMBtu $9.92
TOTAL ENERGY COSTS $2,073,371
RECOMMENDED SAVINGS* $618,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,476
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,490
Cost:
$11,516
$6,925 256,478 $10,565 473 - - $6,925
256,478
kWh
$10,565
473
kW-months/year
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$83,199
Cost:
$100,000
- - - - $83,199 - -
-
kWh
-
-
kW-months/year
$83,199
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$80,954
Cost:
$524,616
$80,954 2,998,283 - - - - $80,954
2,998,283
kWh
-
-
kW-months/year
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$427,303
Cost:
$4,465,290
$168,399 6,237,013 $258,904 11,580 - - $168,399
6,237,013
kWh
$258,904
11,580
kW-months/year
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$9,986
Cost:
-
$9,986 369,847 - - - - $9,986
369,847
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$618,932
Cost:
$5,101,422
$266,264 9,861,621 $269,469 12,053 $83,199 - $266,264
9,861,621
kWh
$269,469
12,053
kW-months/year
$83,199
-
$
TOTAL IMPLEMENTED Savings:
$27,476
Cost:
$11,516
$16,911 626,325 $10,565 473 - - $16,911
626,325
kWh
$10,565
473
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees