IAC logo
IAC Assessment: UL2210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2022
Principal Product automotive carpet
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 60,000
Annual Production 2,106 Tons
Production Hrs. Annual 6,600
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $659,281 11,221,800 kWh $0.06
Electricity Demand $373,363 30,806 kW-months/year $12.12
Electricity Fees $98,721 - $ -
Natural Gas $187,381 20,594 MMBtu $9.10
TOTAL ENERGY COSTS $1,411,536
RECOMMENDED SAVINGS* $192,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,273
Cost:
$11,544
$16,947 287,244 $5,326 439 - - $16,947
287,244
kWh
$5,326
439
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,394
Cost:
-
$4,851 82,574 $1,543 127 - - $4,851
82,574
kWh
$1,543
127
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,208
Cost:
-
$4,208 71,314 - - - - $4,208
71,314
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,235
Cost:
$1,600
$5,235 88,725 - - - - $5,235
88,725
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$86,119
Cost:
$765,706
$62,040 1,051,526 $24,079 1,987 - - $62,040
1,051,526
kWh
$24,079
1,987
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,669
Cost:
$20,000
$5,669 96,091 - - - - $5,669
96,091
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,109
Cost:
$20,000
$3,109 52,697 - - - - $3,109
52,697
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$59,693
Cost:
$150,000
- - - - $59,693 6,560 -
-
kWh
-
-
kW-months/year
$59,693
6,560
MMBtu
TOTAL RECOMMENDED Savings:
$192,700
Cost:
$968,850
$102,059 1,730,171 $30,948 2,553 $59,693 6,560 $102,059
1,730,171
kWh
$30,948
2,553
kW-months/year
$59,693
6,560
MMBtu
TOTAL IMPLEMENTED Savings:
$38,110
Cost:
$13,144
$31,241 529,857 $6,869 566 - - $31,241
529,857
kWh
$6,869
566
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas