IAC logo
IAC Assessment: UL2304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Synthetic Elastomer and non-rubber elastomers
NAICS 325212 - Synthetic Rubber Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 111
Plant Area (Sq.Ft.) 227,000
Annual Production 29,157,000 Pounds
Production Hrs. Annual 4,368
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,984,058 27,516,179 kWh $0.07
Natural Gas $39,695 4,376 MMBtu $9.07
TOTAL ENERGY COSTS $2,023,753
RECOMMENDED SAVINGS* $531,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,814
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$96,568
Cost:
$26,328
$96,568 1,281,362 - - - - $96,568
1,281,362
kWh
-
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$294,679
Cost:
$268,088
- - $294,679 - - - -
-
kWh
$294,679
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,148
Cost:
$36,675
$30,148 418,724 - - - - $30,148
418,724
kWh
-
-
$
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$8,501
Cost:
$89,882
$8,501 118,072 - - - - $8,501
118,072
kWh
-
-
$
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,246
Cost:
$1,300
$4,184 58,105 - - $1,062 117 $4,184
58,105
kWh
-
-
$
$1,062
117
MMBtu
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$84,650
Cost:
$36,445
$84,650 1,175,698 - - - - $84,650
1,175,698
kWh
-
-
$
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,731
Cost:
$40,000
- - - - $11,731 1,226 -
-
kWh
-
-
$
$11,731
1,226
MMBtu
TOTAL RECOMMENDED Savings:
$531,523
Cost:
$498,718
$224,051 3,051,961 $294,679 - $12,793 1,343 $224,051
3,051,961
kWh
$294,679
-
$
$12,793
1,343
MMBtu
TOTAL IMPLEMENTED Savings:
$101,814
Cost:
$27,628
$100,752 1,339,467 - - $1,062 117 $100,752
1,339,467
kWh
-
-
$
$1,062
117
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas