IAC logo
IAC Assessment: UL2305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Automotive Steering Components
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 360
Plant Area (Sq.Ft.) 498,448
Annual Production 224,008 Pieces
Production Hrs. Annual 7,560
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,361 3,244,570 kWh $0.05
Electricity Demand $57,673 6,573 kW-months/year $8.77
Electricity Fees $121,754 - $ -
Natural Gas $24,396 2,164 MMBtu $11.27
TOTAL ENERGY COSTS $379,178
RECOMMENDED SAVINGS* $74,941 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,238
Cost:
$9,672
- - - - $3,238 - - - -
-
kWh
-
-
kW-months/year
$3,238
-
$
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$25,542
Cost:
$325,397
$18,135 345,401 $7,407 844 - - - - $18,135
345,401
kWh
$7,407
844
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,322
Cost:
$444
$1,059 19,991 $263 30 - - - - $1,059
19,991
kWh
$263
30
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,439
Cost:
-
$1,950 38,022 $489 56 - - - - $1,950
38,022
kWh
$489
56
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,738
Cost:
-
$2,738 50,894 - - - - - - $2,738
50,894
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,763
Cost:
$9,750
$8,763 165,330 - - - - - - $8,763
165,330
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$29,120
Cost:
$60,633
$13,146 248,039 - - - - $15,974 1,417 $13,146
248,039
kWh
-
-
kW-months/year
-
-
$
$15,974
1,417
MMBtu
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,779
Cost:
$1,300
$803 15,148 - - - - $976 87 $803
15,148
kWh
-
-
kW-months/year
-
-
$
$976
87
MMBtu
TOTAL RECOMMENDED Savings:
$74,941
Cost:
$407,196
$46,594 882,825 $8,159 930 $3,238 - $16,950 1,504 $46,594
882,825
kWh
$8,159
930
kW-months/year
$3,238
-
$
$16,950
1,504
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas