IAC Assessment: UL2307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Copper-Nickel Alloys
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,726 8,322,120 kWh $0.03
Electricity Demand $394,121 18,551 kW-months/year $21.25
Electricity Fees $157,720 - $ -
Natural Gas $464,379 39,639 MMBtu $11.72
TOTAL ENERGY COSTS $1,308,670
RECOMMENDED SAVINGS* $183,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,544
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,100
Cost:
$2,693
$1,100 42,311 - - - - - - $1,100
42,311
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,654
Cost:
$33,973
$6,719 306,251 $8,935 421 - - - - $6,719
306,251
kWh
$8,935
421
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,834
Cost:
-
$1,834 70,546 - - - - - - $1,834
70,546
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$38,660
Cost:
$22,666
- - - - - - $38,660 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$38,660
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$38,855
Cost:
$480,889
$12,347 480,748 $26,508 1,248 - - - - $12,347
480,748
kWh
$26,508
1,248
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,752
Cost:
$14,626
$4,752 162,006 - - - - - - $4,752
162,006
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$36,790
Cost:
$34,740
- - - - $36,790 3,361 - - -
-
kWh
-
-
kW-months/year
$36,790
3,361
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$46,192
Cost:
$39,000
- - - - $46,192 4,219 - - -
-
kWh
-
-
kW-months/year
$46,192
4,219
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$183,837
Cost:
$628,587
$26,752 1,061,862 $35,443 1,668 $82,982 7,580 $38,660 - $26,752
1,061,862
kWh
$35,443
1,668
kW-months/year
$82,982
7,580
MMBtu
$38,660
-
$
TOTAL IMPLEMENTED Savings:
$53,544
Cost:
$71,406
$7,819 348,562 $8,935 421 $36,790 3,361 - - $7,819
348,562
kWh
$8,935
421
kW-months/year
$36,790
3,361
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost