IAC logo
IAC Assessment: UL2308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Automotive Carpet
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 230,000
Annual Production 5,151,901 Pieces
Production Hrs. Annual 6,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $481,532 16,825,000 kWh $0.03
Electricity Demand $925,351 48,062 kW-months/year $19.25
Electricity Fees $383,372 - $ -
Natural Gas $320,095 55,844 MMBtu $5.73
TOTAL ENERGY COSTS $2,169,347
RECOMMENDED SAVINGS* $313,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49,167
Cost:
$30,537
$24,926 870,801 $24,241 1,259 - - $24,926
870,801
kWh
$24,241
1,259
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,423
Cost:
$1,362
$2,423 84,672 - - - - $2,423
84,672
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,994
Cost:
$2,560
$3,994 137,740 - - - - $3,994
137,740
kWh
-
-
kW-months/year
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$135,738
Cost:
$1,570,854
$57,266 2,000,925 $78,472 4,075 - - $57,266
2,000,925
kWh
$78,472
4,075
kW-months/year
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$109,084
Cost:
$64,636
- - - - $109,084 - -
-
kWh
-
-
kW-months/year
$109,084
-
$
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$8,204
Cost:
$36,450
$8,204 282,895 - - - - $8,204
282,895
kWh
-
-
kW-months/year
-
-
$
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,871
Cost:
$15,000
$4,871 167,961 - - - - $4,871
167,961
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$313,481
Cost:
$1,721,399
$101,684 3,544,994 $102,713 5,334 $109,084 - $101,684
3,544,994
kWh
$102,713
5,334
kW-months/year
$109,084
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost