IAC logo
IAC Assessment: UL2309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2023
Principal Product Steering Columns
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 500
Plant Area (Sq.Ft.) 644,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 7,140
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $456,811 2,998,116 kWh $0.15
Electricity Demand $266,112 18,450 kW-months/year $14.42
Electricity Fees $392,153 - $ -
Natural Gas $28,268 2,336 MMBtu $12.10
TOTAL ENERGY COSTS $1,143,344
RECOMMENDED SAVINGS* $250,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,305
Cost:
$2,688
$8,633 56,794 $1,672 116 - - $8,633
56,794
kWh
$1,672
116
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$957
Cost:
$1,596
$957 6,297 - - - - $957
6,297
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,637
Cost:
-
$9,245 60,825 $3,392 235 - - $9,245
60,825
kWh
$3,392
235
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,370
Cost:
$18,360
$21,370 140,596 - - - - $21,370
140,596
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$194,066
Cost:
$1,198,885
$162,018 1,063,349 $32,048 2,222 - - $162,018
1,063,349
kWh
$32,048
2,222
kW-months/year
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,607
Cost:
$1,000
$2,170 14,255 - - $437 36 $2,170
14,255
kWh
-
-
kW-months/year
$437
36
MMBtu
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$8,813
Cost:
$15,000
$8,813 57,844 - - - - $8,813
57,844
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$250,755
Cost:
$1,237,529
$213,206 1,399,960 $37,112 2,573 $437 36 $213,206
1,399,960
kWh
$37,112
2,573
kW-months/year
$437
36
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas